POWER LIFTGATE (PLG) DRIVE UNIT INSPECTION
id091100003300
LH
1. Disconnect the negative battery terminal. (See NEGATIVE BATTERY TERMINAL DISCONNECTION/CONNECTION [(E)].)
2. Remove the power liftgate (PLG) drive unit. (See POWER LIFTGATE (PLG) DRIVE UNIT REMOVAL/INSTALLATION.)
3. Apply battery positive voltage and connect the ground to power liftgate (PLG) drive unit terminals G and H, and then inspect the power liftgate (PLG) drive unit operation.
B+ Terminal
|
Ground Terminal
|
Operation
|
H
|
F
|
Liftgate close operation
|
G
|
F
|
Liftgate open operation
|
ac30zw00002038
|
RH
1. Disconnect the negative battery terminal. (See NEGATIVE BATTERY TERMINAL DISCONNECTION/CONNECTION [(E)].)
2. Remove the power liftgate (PLG) drive unit. (See POWER LIFTGATE (PLG) DRIVE UNIT REMOVAL/INSTALLATION.)
3. Apply battery positive voltage and connect the ground to power liftgate (PLG) drive unit terminals G and H, and then inspect the power liftgate (PLG) drive unit operation.
B+ Terminal
|
Ground Terminal
|
Operation
|
H
|
F
|
Liftgate close operation
|
G
|
F
|
Liftgate open operation
|
ac30zw00002038
|